Projects

Project Portfolio

Foundation works, industrial buildings, housing developments, roofing structures & civil engineering across Johor.

CATEGORY PORTFOLIO

Foundation Works

9 Items

STRUCTURE, FOUNDATION, SLAB AND DRAINAGE WORKS

March 2024 To April 2025

New RC Slab, Drainage And Foundation (Machinery, Chimney, Conveyor, Switch Board And Building Structure) Works For New Tilting Sterilizer

STRUCTURE AND FOUNDATION WORKS

May 2024 To August 2024

Additional Conveyor Foundation Works For New Tilting Sterilizer

Activated Carbon Processing Plant

April 2022 To March 2023

Activated Carbon Processing Plant

Boiler House Extension Works

December 2022 To June 2023

Boiler House Extension Works.

Upgrading Existing Boiler 3 Including New Boiler Foundation

October 2020 - December 2020

Upgrading Existing Boiler 3 Including New Boiler Foundation Modification Works, F.F. Fan, S.A. Fan, F.D.Fan, And I.D. Fan Foundation Works

Dryer System Foundation Works

August 2020 to December 2020

Dryer System Foundation Works

RC Foundation Works For New Sterilizer Building

From June 2018 to October 2018

RC Foundation Works For New Sterilizer Building.

Biogas Plant Building Extension And Machinery Foundation Works

From January 2018 to May 2018

Biogas Plant Building Extension And Machinery Foundation Works.

Foundation Works

From April 2017 to August 2017

Foundation Works Of New Boiler/ Power House, Sterilizer Building, Chimney, Wet Scrubber, Cable Trenches, Blowdown Pit, Forced Draft Fan Base, Secondary Air Fan Base, Ash Settling Pond And Ash Pond.

CATEGORY PORTFOLIO

Building Works

14 Items

TILTING STRILIZER

March 2024 To Jan 2025

Install Roofing, Wall Cladding & Purlin With Timber Trusses And VPN Euroline Roofing Sheet For Tilting Sterilizer

Fertilizer And Chemical Store

April 2022 To September 2022

Fertilizer And Chemical Store

Concrete Slab, Bund Wall, Drainage Work

March 2023 to May 2023

Supply Labour, Tools, Materials And All Els Nessessary To Construct And Complete Concrete Slab, Bund Wall, Drainage And Other Ancillary Work

BUILDING DRIANAGE WORKS

April 2023 To September 2023

Ash Collection Bay, Emphty Bunch Bunker Wall, Turbine Engine Foundation And Drianage Works

BUILDING WORLS

December 2022 - June 2023

New Switch Board Room

BUILDING WORLS

From May 2024 until July 2024

Upgrade And Repair Existing Fertiliser Store

RC Structure, Platform, Staircase & Timber Handrail (Biogas Plant)

From February 2021 to August 2021

RC Structure, RC Platform, RC Staircase And Timber Handrail At Biogas Plant.

RC Cullet Storage (Batch Plant)

From January 2021 to May 2021

RC Cullet Storage (Sungai Lembing,Pahang)

Single Storey Semi-Detached House & Fertilizer Store

From September 2020 to January 2021

Single Storey Semi-Detached House (Labour Quarters) And Fertilizer Store

New TNB Substation

From December 2019 to August 2020

New TNB Substation

Estate Building Works

From March 2018 to August 2019

Estate Building Works ( Gua Musang, Kelantan)

Fast Food Restaurant (KFC)

From April 2019 to September 2019

Fast Food Restaurant ( KFC ).

BUILDING WORLS

From April 2016 to March 2017

Proposed Double Storey Office Building, Lab, Weight Bridge, Concrete Road Extension, Guard House, New Drainage System and Fencing Works.

BUILDING WORLS

From December 2023 To April 2024

To Design, Supply Material, Manpower, Tools, Equipments, Installations And Else Necessary Consumable For Upgrade LEV Paint Room.

CATEGORY PORTFOLIO

Housing Development

1 Item

39 Units Mixed Housing Development

May 2017 - November 2018

39 Units Mixed Housing Development

CATEGORY PORTFOLIO

Structure, Roofing & Fencing Works

18 Items

Structure, Floor Slabs & Roofing Works

August 2019

RC Floor Resurfacing Works, RC Footings, Replace Existing Metal Roofing, Install Wall Cladding c/w Truss Support And Metal Door.

Proposed Replace Existing Roofing Sheet

May 2025 To October 2025

Proposed Replace Existing Roofing Sheet With New Metal Roofing Sheet, L Flashing Work, Replace Transparent Roofing Sheet, Repair Existing Gutter, Replace Damaged Timber Truss & Metal Roofing, Making Good Existing Gutter & Downpipe For Warehouse

Dismantle And Reinstall Back Existing Roofing

April 2025 To June 2025

Dismantle And Reinstall Back Existing Roofing & Purlin, Replace Existing Transparent Roofing Sheet

Solar Panel Roofing Works

August 2025 To September 2025

Proposed Solar Panel Roofing Works And Relocation Existing Water Storage Tank

FENCING WORKS

Feb 2023 - June 2023

Proposed Security Fencing Works (Sungai Lembing, Pahang)

FENCING WORKS

December 2024

Repair Existing Primeter Chainlink Fencing And Gate Works

FENCING & CONCRETE SLAB WORKS

October 2023 to November 2023

Supply Labour, Tools, Materials And Else Necessary Equipment To Construct Perimeter Fencing Strip Footing And Concrete Road

ROOFING WORKS

From July 2023 - September 2023

Replace Existing Metal Roofing With PU Metal Foam Roofing Works

ROOFING WORKS

October 2023

Replace Existing Roof, Wall Cladding & Purlin For ESP With Timber Trusses And VPN Euroline Roofing Sheet

ROOFING WORKS

From May 2024 To January 2025

Install Roofing, Wall Cladding & Purlin With Timber Trusses And VPN Euroline Roofing Sheet For Tilting Sterilizer

ROOFING WORKS

From April 2024 To May 2024

Replace Existing Metal Roofing With PU Metal Foam Roofing Works

ROOFING & WALL CLADDING WORKS

From May 2023 To July 2023

Replace Existing Roof, Wall Cladding & Purlin For ESP With Timber Trusses And VPN Euroline Roofing Sheet.

ROOFING & WALL CLADDING WORKS

From December 2023 To March 2024

Design, Supply Material, Manpower, Tools, Equipments, Installations And Else Necessary Consumable For Upgrade Electrical Wiring And Renovate Courier Office

Fertilizer And Chemical Store

April 2022 - September 2022

Fertilizer And Chemical Store.

Fencing Works

March 2021

Anti Climb Fencing Works, Wall Cladding, Forming Drain And Chemical Trap Pit

STRUCTURE AND ROOFING WORKS

December 2023 to February 2024

Roofing and Building Works

Structure and Roofing Works

October 2020 to December 2020

Remove And Replace Existing Roofing & Purlin With Timber For Scrubber Plant (Main Building).

Structure and Roofing Works

From October 2020 to December 2020

Cullet Storage (Pallet Area).

CATEGORY PORTFOLIO

Repairing Works

6 Items

REPAIRING WORKS

March 2025 December 2025

Proposed Painting Works For Main Office And Warehouse (Shah Alam)

CLEANING WORKS

May 23

Cleaning And Remove Existing Debris Works On Existing Office Roofing And Gutter Between Processing And Boiler Building.( Sungei Lembing, Pahang )

REPAIRING WORKS

From April 2024 To June 2024

Repairing Jobs - Fabricate & Replace Gob Reject Chute With Removable Type Liner Plate - Fabricate New Bottle Reject Bin - Modify Hot End Ware Reject Chute & Add 10 Mm Liner Plate At Impact Area - Repair Existing Concrete Curb To Prevent Water Overflow - Close Existing Drain To Underground With Concrete - Supply & Install New GI Tank At M1 Underground - Make New Drain With Heavy Duty Grating - Install GI Downpipe To Downtank

REPAIRING WORKS

April 2023

Repair Existing Roller Shutter Size: 5400mm x 4000mm.

BIRD CANTROL WORKS

Aug 2022 to September 2022

Kerja-kerja membaiki bumbung dan pembersihan siling perjabat ( Bird control works)

REPAIRING WORKS

From January 2018 to March 2018

55 Feet Height Conveyor Platform Repairing Works

CATEGORY PORTFOLIO

Floor Slabs

5 Items

Concrete Slab Works

February 2025 To June 2025

Concrete Slab Works For Existing Warehouse (Shah Alam)

Proposed Concrete Slab And Drainage Works

March 2025 To June 2025

Proposed Concrete Slab And Drainage Works

BASKETBALL COURT

June 2024 To July 2024

New Basketball Court c/w Pole and Shading Mesh.

Activated Carbon Processing Plant

From April 2022 to March 2023

Activated Carbon Processing Plant

Concrete Works

From September 2016 to May 2017

17000m2 RC Floor Slab Loading Bay.

CATEGORY PORTFOLIO

CPO Tanks

3 Items

200 Ton CPO Tank Foundation

November 2020 to December 2020

1 Unit 200 Ton CPOTank Foundation.

2000 Tons CPO Tank Foundation

From December 2019 to February 2020

2units CPO 2000 Tons Tank Foundation Works For 90 Tons FFB/HR.

3600 Ton CPO Tank

From January 2018 to April 2018

3600 Ton CPO Tank.

CATEGORY PORTFOLIO

Weighbridge

1 Item

Weighbridge Sand Mining

From October 2018 to November 2018

Weighbridge Sand Mining.

CATEGORY PORTFOLIO

Net Water Technology

1 Item

Foundation,Timber, Structure & Roofing

From December 2018 to January 2019

Timber structure, RC foundation & roofing works of net water technology.

CATEGORY PORTFOLIO

Other Projects

11 Items

RENOVATION WORKS

December 2024

PU Panel And Partitioning Works For New Machine (Cold Room)

PVC STRIP CURTAIN WORKS

October 2022 To December 2022

Supply Labour, Tools, Material And Else Necessary Equipment To Install PVC Strip Curtain At Warehouse Entrance

EARTHWORKS

January 2024 To April 2024

Earthwork And Soil Test For New Tilting Sterilizer.

LOADING RAMP WORKS

April 2021 To April 2021

Upgrade And Repair Existing Loading Ramp

SURVEYING WORKS

October 2024

Full Detail Survey For Entire Mill Area And Pond Area

PIPING WORKS

Oct 2017 - Jan 2018

Piping Works For M1 Furnace Return to Water Line

Conveyor Works

From March 2021 to May 2021

Fibre Conveyor (In Connection To EFP Plant) Roof Trusses, Wall Cladding & Roofing, Belt, Roller, Main Frame, Painting Works, Motor, Gear Box, Electrical Works And CCTV Replacement & Repairing Works

Road Works

From October 2020 to December 2020

Concrete Access Road (Gua Musang, Kelantan)

Treatment Plant Works

From March 2018 to August 2019

Effluent Polishing Plant. ( Jangka, Pahang)

Piping Works

From May 2017 to July 2017

Supply & Install New 6Inches GI Pipe. For SAJ Lacoming Water

Slope Protection Works

Mar 2016 to Nov 2016

Slope Protection By Using Maccaferri MacWeb Cellular Soil Containment Cover With Cow Grass.